RCST Bridge Recovery This Weekend

Posts to this topic should be limited to discussion related to trailwork, including ideas for maintaining existing trails or creating new ones

RCST Bridge Recovery This Weekend

Postby knobbysideup » Wed Nov 30, 2011 10:35 am

Forwarding along...

FROM: THE LAST BASH! 2011 Rattling Creek Singletrackers Mountain Bike BASH
-------------------------------------------------

Since I e-mailed all of you when we were looking for help for the Bridge Retrieval for December 4, below is a follow-up e-mail as an FYI. We got enough folks and we just wanted to keep you up-to-date. More is at www.rcst1.blogspot.com

All,

The bridge retrieval is definitely going to happen on December 4. We will meet at the west end of Doc Smith Trail. This is the end nearest the intersection of Doc Smith and Rattling Creek Trails. We're not quite at 20, but we expect some to just show up and we feel confident we'll have enough to get the beams moved out of the creek and hopefully put back in place over the creek by the time we finish up.

Please bring boots and/or hip waders if you own them and plan to get wet. The temps are to be above freezing but not by much so anything you own that you would use to help out with getting wet in cold water and cold air temps. I'm thinking along the lines of neoprene gloves, booties, wetsuits type things if you feel the need and have anything like that on hand.
The creek is about a foot to 2 feet deep at spots and there's one 2.5', or slightly deeper "hole" at one spot under the bridge.

Definitely bring a change of clothes/shoes to change into after the work is done.

We'll have Clif bars and water on hand.

-We plan on removing the treads from the big bridge to break it down into two separate beams. I estimate these beam to weigh ~1000 lbs.
-We will then use a come-along to drag the beams out of the creek.
-After that we have 10- 10 foot lengths of rope with handles on each end that we intend to loop around the beam spaced along the length of a beam to allow 20 able bodies souls to line up, 10 on one side and 10 on the other, to work together to move the beams the short distance to get them back to the original location. We'll move both beams into position to stage them to be set into position.
-We have cut a path to allow us to move the beam to the creek and intend to move the beams across the creek into position onto the existing piers.
-This will be the final step at the end and is where we see the need for people to get wet !!! Saving this for the very end should limit the amount of time we will be wet (and probably cold) and then get everyone into that warm change of clothes that they've packed to change into.

Thanks to everyone that can make it to help out with this project. We're feeling the love of the Rattling Creek trails!

Rick and Jill
:(){ :|:& };:
User avatar
knobbysideup
 
Posts: 161
Joined: Fri Oct 16, 2009 8:27 am
Location: Felton, PA

Return to Trailwork

Who is online

Users browsing this forum: No registered users and 1 guest

cron